A Job Hazard Analysis for groundwork identifies risks in excavation, blasting, piling, and work near existing utilities. It is based on Canada Labour Code Part II and COHSR, and includes requirements for utility guidance before digging starts.

RAMSagent evaluates geotechnical factors, utility proximity, and urban considerations to provide a Job Hazard Analysis suitable for both planning and production phases.

Typical risks for Risk Assessment — Groundwork

Risks, description, and applicable legislation
Risk Description Legal Severity
Collapse Risk in Excavation Soil collapse in excavations deeper than 1.25 m without sloping or shoring is one of the construction industry's leading causes of fatalities — requires geotechnical assessment and support structures. Canada Labour Code Part II, COHSR Critical
Blasting Work Rock throw, pressure waves, and vibration damage to nearby structures — requires blasting permits, barricades, and warning signals. Canada Labour Code Part II, COHSR Critical
Damage to Existing Utilities Cable damage, gas leaks, or water leaks during digging without current guidance — utility guidance is mandatory. Canada Labour Code Part II, COHSR High
Collision Risk from Work Machinery Excavators and dumpers with limited visibility — requires signalers, separated walkways, and high-visibility clothing. Canada Labour Code Part II, COHSR High
Noise and Vibrations Long-term hearing damage and vibration injuries (HAVS) — requires measurement, hearing protection, and rotation. Canada Labour Code Part II, COHSR Medium
Canada Labour Code Part II, COHSR Risks in Certain Types of Work
Regulates collapse risk, excavation, and blasting; covers tunneling and rock work.
Canada Labour Code Part II Basic Obligations
Systematic occupational health and safety management — the foundation for all civil engineering projects.
COHSR Workplace Hazards
Noise limits, vibrations, and chemical hazards in civil and construction work.

Frequently Asked Questions

When is a geotechnical assessment required?
For excavations deeper than 1.25 m without sloping or support structures. RAMSagent automatically triggers the requirement when excavation depth is specified.
Is Ledningskollen integration included?
RAMSagent references Ledningskollen in the Job Hazard Analysis (JHA) but does not automatically retrieve the instructions — the instructions are attached as a file to the project.