Job Safety Analysis for Construction — create with RAMSagent
A method statement document for construction is a structured document that describes how a task on a construction site should be carried out safely. It identifies hazards, lists protective measures, and allocates responsibilities in accordance with the Health and Safety at Work Act 1974 and the Construction (Design and Management) Regulations 2015.
RAMSagent reduces the method statement time from half a day to about ten minutes. Describe the work in free text, review the agent's suggestions, and send out for digital signing directly to the work team.
Typical risks for Job Safety Analysis — Construction
| Risk | Description | Legal | Severity |
|---|---|---|---|
| Fall Risk from Scaffolding | Risk of falling from height during the assembly, disassembly, and use of scaffolding — personal fall protection equipment or collective protection is required. | AFS 2023:11, 15 kap | High |
| Lifting Heavy Construction Elements | Crush and fall injury risk when lifting prefabricated elements, trusses, and beams — requires a lifting plan and a qualified signal person. | AFS 2023:11, 11 kap | High |
| Exposure to Silica Dust | Health risk during cutting and demolition of concrete, brick, and plaster — requires water spraying, extraction, and respiratory protection. | AFS 2023:10 | Medium |
| Traffic on the Construction Site | Risk of being struck by vehicles and machinery in and around the work area — requires barriers and signal guarding. | AFS 2023:13 | Medium |
Applicable Regulations
- AFS 2023:1 Basic Duties of Employers and Other Responsible Persons
- The foundation for systematic health and safety work — applies to all workplaces, including construction.
- AFS 2023:13 Hazards in Certain Types of Work
- Specific requirements for construction and civil engineering work, tunneling, and excavation.
- AFS 2023:11 Work Equipment and Personal Protective Equipment
- Requirements for scaffolding (assembly, inspection, use), fall protection, and lifting devices.
Frequently Asked Questions
- Is RAMSagent's method statement considered HSE compliant?
- Yes. RAMSagent generates method statements that meet the requirements of the Health and Safety at Work Act 1974 and the Construction (Design and Management) Regulations 2015, including risk assessment, protective measures, and allocation of responsibilities. The document can be digitally signed by invited reviewers and the work team.
- Can I use the method statement offline on site?
- Yes. RAMSagent is a PWA that works offline. Changes sync automatically when you regain coverage.
- How long does it take to create a method statement?
- Typically 5–10 minutes: you describe the work in free text or dictate, the agent suggests risks and measures, you review and sign.
Related Guides
Free Word Template: Method Statement
Enter your email address and consent to processing according to the policy below. You'll then receive a link to download the template.