Arbetsberedning Fasad — ställning & fallskydd enligt AFS 2023:11 Saltar para conteúdo

Procedimento de trabalho seguro para Fachada — crie com RAMSagent

A method statement for façades describes how the assembly, plastering, painting, or renovation of façades is carried out safely from scaffolding or aerial work platforms. It includes the choice of scaffolding class, fall protection plan, wind limits, and measures in case of public traffic impact.

RAMSagent integrates scaffolding plans, fall protection plans, and weather action rules into the same method statement.

Riscos típicos para Procedimento de trabalho seguro — Fachada

Riscos, descrição e legislação aplicável
Risco Descrição Legislação Gravidade
Fall from Scaffolding Façade scaffolding over 2 m requires a top rail, mid rail, and toe board at all working levels. Access is only permitted via a stair tower; climbing on scaffolding components is prohibited. AFS 2023:11, 15 kap; AFS 2013:4 Crítica
Wind Impact At wind speeds exceeding 10 m/s, metal assembly and façade panels must be halted. Scaffolding must be designed for load + wind load according to the manufacturer's instructions. AFS 2013:4 Alta
Falling Materials to Pedestrians When working on façades above public traffic, protective canopies or solid barriers are required according to the Building Act. A signal person must be present if the public is nearby. AFS 2023:13, 10 kap Alta
Ergonomic Strains Repetitive work above shoulder height can cause strain injuries. The height of the platform should be adjusted so that work is performed between waist and shoulder level. AFS 2012:2 Média
AFS 2013:4 Scaffolding
Regulations for scaffolding class, contractor training, inspection, and documentation.
AFS 2023:11 Work at Height
Chapter 15 requires collective protection for fall heights over 2 m on construction sites.
AFS 2023:13 Construction and Civil Engineering Work
Requirements for protective canopies and barriers when working over the public.

Perguntas frequentes

Who is allowed to assemble scaffolding?
According to HSE guidance, training in 'General Scaffolding' is required for scaffolding up to 9 m and 'Special Scaffolding' for over 9 m or with deviations in execution.
What scaffolding class is sufficient for plastering work?
Plastering work with materials typically requires class 4 (250 kg/m²). Always check the scaffolding drawing and the manufacturer's instructions — RAMSagent highlights the choice in the method statement.

Modelo Word gratuito: procedimento de trabalho seguro

Indique o seu endereço de e-mail e aceite o tratamento de dados conforme a política abaixo. Receberá então o link para download do modelo.