A construction risk assessment is a structured mapping of risks in a construction project — from the design phase to commissioning. It evaluates the likelihood and consequences of each risk and guides the selection of protective measures according to HSE guidance and the Construction (Design and Management) Regulations 2015.
RAMSagent generates a comprehensive project-level risk assessment that complements your method statements for each task. The assessment is automatically updated when new tasks or contractors are added.
Riscos típicos para Avaliação de riscos — Construção
| Risco | Descrição | Legislação | Gravidade |
|---|---|---|---|
| Falls from Height | The leading cause of fatal accidents in construction — requires a coordinated fall protection plan for all contractors working above 2 meters. Collective protection is prioritized over personal equipment. | AFS 2023:11, 15 kap | Crítica |
| Coordination Risks Between Contractors | Multiple contractors on the same site create collision risks and communication gaps — requires clear role distribution and joint safety meetings as per HSE guidance. | AFS 2023:13, 3 kap | Alta |
| Exposure to Silica Dust | Long-term health risk (silicosis, COPD) when cutting and demolishing concrete, brick, and plaster — requires hygienic exposure limits, extraction systems, and respiratory protection. | AFS 2023:10 | Alta |
| Manual Handling and Ergonomics | Cumulative strain injuries from manual handling of construction elements, bags, and tools — requires lifting aids and job rotation. | AFS 2023:11, 11 kap | Média |
| Traffic on and Around the Worksite | Risk of collisions from vehicles, machinery, and deliveries — requires a traffic plan, separated walkways, and signal monitoring. | AFS 2023:13 | Média |
Regulamentos aplicáveis
- AFS 2023:1 Fundamental Duties of Employers and Other Duty Holders
- The framework for systematic workplace safety management (SAM) — risk assessment, measures, monitoring, and annual review.
- AFS 2023:13 Risks Associated with Certain Types of Work
- Construction-specific requirements: coordination between contractors, prior notification to the HSE at applicable threshold levels.
- AFS 2023:10 Risks in the Workplace
- Hygienic exposure limits, chemical risk sources (silica dust, asbestos), lone working.
Perguntas frequentes
- What is the difference between a risk assessment and a method statement?
- The risk assessment is a living project document that covers the entire construction — it evaluates likelihood × consequence for all known risks. The method statement is a task-specific document used just before work starts, detailing exactly how it should be carried out safely. RAMSagent automatically links them together.
- Who should conduct the risk assessment?
- The employer as per HSE guidance. In projects with multiple contractors, specific coordination requirements apply — RAMSagent helps you document risks, measures, and follow-up.
- How often should the risk assessment be updated?
- Whenever there is a change affecting the work environment — new contractor, changed method, incident, or near miss. RAMSagent logs the updates so that the revision history is preserved.
Guias relacionados
- Method statement Construction Complement the risk assessment with task-specific method statements.
- Risk Assessment Plumbing For plumbing contractors collaborating on the site.
- Risk Assessment Electrical For electrical contractors working together.
- Risk Assessment Groundworks For groundworks contractors in the same project.
Modelo Word gratuito: avaliação de riscos
Indique o seu endereço de e-mail e aceite o tratamento de dados conforme a política abaixo. Receberá então o link para download do modelo.