A method statement for demolition describes exactly how a demolition task is carried out safely — from preliminary investigation of hazardous materials (asbestos, PCB, lead) to dismantling, sorting, and disposal. The document should refer to HSE guidance, CDM 2015, and UK regulations on construction and demolition work.
RAMSagent generates complete method statements for each demolition task, including asbestos screening, dust control plans, and recycling classifications — ready to print or share with subcontractors.
Typical risks for Job Safety Analysis — Demolition
| Risk | Description | Legal | Severity |
|---|---|---|---|
| Asbestos and Other Hazardous Materials | Buildings constructed before 1982 may contain asbestos in pipe insulation, facade boards, and floor adhesives. A material inventory is required before demolition, and work can only be performed with permission and medical monitoring. | AFS 2023:10, 16 kap; AFS 2005:6 | Critical |
| Respirable Crystalline Silica (RCS) | Demolition of concrete, brick, and plaster releases respirable crystalline silica (RCS) which causes silicosis and lung cancer. The exposure limit of 0.1 mg/m³ requires water suppression or H-class vacuuming. | AFS 2023:10, 3 kap | High |
| Fall Risks During Partial Demolition | When floors are demolished in stages, edges, stair openings, and lift shafts become temporary fall edges. Collective protection (guardrails, nets) must be re-established before work continues above 2 m. | AFS 2023:11, 15 kap | Critical |
| Crushing Risks During Machine-Controlled Demolition | Excavators with demolition shears require exclusion zones of at least 1.5 times the machine's reach. No one is allowed in the risk area during demolition. | AFS 2023:13, 8 kap | High |
Applicable Regulations
- AFS 2023:13 Planning and Execution of Construction and Demolition Work
- Framework regulations for construction sites, including demolition. Requires coordination, notification, and safety responsibilities.
- AFS 2023:10 Chemical Workplace Risks
- Regulates silica dust, asbestos, and other hazardous substances released during demolition. Requires risk assessment, measurement, and action plans.
- AFS 2005:6 Medical Surveillance in the Workplace
- Medical surveillance is required for personnel working with asbestos-containing materials.
Frequently Asked Questions
- Is an asbestos inventory required before demolition?
- Yes — for all buildings constructed before 1982 (and often later), HSE guidance requires a material inventory before demolition. RAMSagent reminds users of the inventory in the method statement and links it to the required asbestos remediation.
- When is notification required for demolition?
- Notification to the HSE is required when the work is expected to last more than 30 working days with more than 20 simultaneous workers, or more than 500 person-days.