Job Safety Analysis for Groundwork — create with RAMSagent

A site preparation for groundworks manages risks associated with excavation, blasting, piling, and work near existing utilities in accordance with HSE guidance and CDM 2015 (Chapter 5, collapse risk). It ensures that utility location information is obtained and that collapse risks have been assessed.

RAMSagent integrates with utility location requirements and HSE guidance so you never miss a utility location or collapse risk assessment.

Typical risks for Job Safety Analysis — Groundwork

Risks, description, and applicable legislation
Risk Description Legal Severity
Collapse Risk in Excavation Risk of soil collapse in excavations deeper than 1.25 m without sloping or shoring — requires geotechnical assessment and support structures. AFS 2023:13, 5 kap Critical
Damage to Existing Utilities Cable damage, gas leaks, or water leaks during excavation without utility location information via utility mapping. AFS 2023:13 High
Blasting Operations Flying debris and shockwaves during blasting in urban areas — requires cordoning off, warning signals, and blasting permits. AFS 2023:13 Critical
AFS 2023:13 Risks in Certain Types of Work
Chapter 5 regulates collapse risk, excavation, and blasting; Chapter 12 covers tunneling and rock work.
AFS 2023:1 Fundamental Duties
Systematic approach to workplace safety — the foundation for all groundworks contracts.
AFS 2023:11 Work Equipment
Requirements for excavators, piling equipment, and fall protection at edges — Chapter 15.

Frequently Asked Questions

Is utility mapping integration included?
RAMSagent points to utility mapping but does not automatically retrieve the information — you attach it as a file to the project.