Method statement for Demolition — create with RAMSagent

A method statement for demolition work explains how a specific task will be carried out safely on site — hazards, sequence, plant, PPE and supervision. It supports CDM 2015 coordination and aligns with the Management of Health and Safety at Work Regulations 1999.

RAMSagent drafts consistent method statement content for demolition work, keeps hazards and controls traceable, and speeds review before you distribute to site teams.

Typical risks for Method statement — Demolition

Risks, descriptions and applicable regulations
Risk Description Legal basis Severity
Asbestos and legacy contaminants Refurbishment/demolition surveys and licensed removal before breaking containment — CAR 2012. Control of Asbestos Regulations 2012 Critical
Structural instability Partial demolition, propping and sequencing — temporary works design. CDM 2015; BS 5975 (temporary works) Critical
Dust and public safety Respirable silica, public protection, hoarding and debris nets. COSHH 2002; CDM 2015 High
Utilities strike Service drawings, CAT scanning and permit-to-dig before mechanical excavation near services. HSG47 (avoiding danger from underground services) High
HSW Act 1974 Health and Safety at Work etc. Act 1974
Primary duties for employers and contractors to ensure health, safety and welfare.
CDM 2015 Construction (Design and Management) Regulations 2015
Client, principal designer and principal contractor duties; construction phase plan.
MHSWR 1999 Management of Health and Safety at Work Regulations 1999
Risk assessment, competent advice, arrangements and monitoring.

Frequently asked questions

Is a method statement the same as a risk assessment for demolition work?
No. A risk assessment identifies hazards and overall control measures; a method statement describes how a specific task will be carried out safely on site. RAMSagent links them so teams stay aligned.
Does RAMSagent replace competent advice?
No. RAMSagent accelerates drafting and consistency with common UK construction duties (CDM/HSE). A competent person must still review site-specific controls.