Method statement for Electrical — create with RAMSagent
A method statement for electrical installation explains how a specific task will be carried out safely on site — hazards, sequence, plant, PPE and supervision. It supports CDM 2015 coordination and aligns with the Management of Health and Safety at Work Regulations 1999.
RAMSagent drafts consistent method statement content for electrical installation, keeps hazards and controls traceable, and speeds review before you distribute to site teams.
Typical risks for Method statement — Electrical
| Risk | Description | Legal basis | Severity |
|---|---|---|---|
| Electric shock and arc flash | Dead working as default; live working only under controlled permit procedures. | Electricity at Work Regulations 1989 | Critical |
| Working at height (roof installs) | Collective protection, MEWPs and edge protection. | Work at Height Regulations 2005 | High |
| Temporary installations | RCD protection, cable management and competent design. | BS 7671 (wiring regulations) as applicable | Medium |
| Lone working / lock-out | Isolation, proving dead, tagging and communication. | Electricity at Work Regulations 1989 | Medium |
Applicable regulations
- HSW Act 1974 Health and Safety at Work etc. Act 1974
- Primary duties for employers and contractors to ensure health, safety and welfare.
- CDM 2015 Construction (Design and Management) Regulations 2015
- Client, principal designer and principal contractor duties; construction phase plan.
- MHSWR 1999 Management of Health and Safety at Work Regulations 1999
- Risk assessment, competent advice, arrangements and monitoring.
Frequently asked questions
- Is a method statement the same as a risk assessment for electrical installation?
- No. A risk assessment identifies hazards and overall control measures; a method statement describes how a specific task will be carried out safely on site. RAMSagent links them so teams stay aligned.
- Does RAMSagent replace competent advice?
- No. RAMSagent accelerates drafting and consistency with common UK construction duties (CDM/HSE). A competent person must still review site-specific controls.
Related guides
Free Word template: method statement
Enter your email address and approve processing according to the policy below. You will then receive a link to download the template.