Risk assessment for Electrical — create with RAMSagent

A risk assessment for electrical installation identifies significant hazards, evaluates risk (likelihood and severity), and defines proportionate controls before work starts. It complements task-level method statements and supports ongoing review.

RAMSagent drafts consistent risk assessment content for electrical installation, keeps hazards and controls traceable, and speeds review before you distribute to site teams.

Typical risks for Risk assessment — Electrical

Risks, descriptions and applicable regulations
Risk Description Legal basis Severity
Electric shock and arc flash Dead working as default; live working only under controlled permit procedures. Electricity at Work Regulations 1989 Critical
Working at height (roof installs) Collective protection, MEWPs and edge protection. Work at Height Regulations 2005 High
Temporary installations RCD protection, cable management and competent design. BS 7671 (wiring regulations) as applicable Medium
Lone working / lock-out Isolation, proving dead, tagging and communication. Electricity at Work Regulations 1989 Medium
HSW Act 1974 Health and Safety at Work etc. Act 1974
Primary duties for employers and contractors to ensure health, safety and welfare.
CDM 2015 Construction (Design and Management) Regulations 2015
Client, principal designer and principal contractor duties; construction phase plan.
MHSWR 1999 Management of Health and Safety at Work Regulations 1999
Risk assessment, competent advice, arrangements and monitoring.

Frequently asked questions

When should we review the risk assessment for electrical installation work?
Review when the scope, site conditions, team, plant or materials change, and periodically as part of your health and safety arrangements.
Can RAMSagent generate follow-up method statements?
Yes. Create task-level method statements from the same project context so controls stay traceable from assessment to execution.