Procedimiento seguro para Enfoscado — crea con RAMSagent
Una planificación de trabajo para enlucido describe la demolición del enlucido existente, el enlucido con mortero (cal-cemento, cemento, cal) y el enlucido fino. Incluye polvo de sílice, daño por álcalis, seguridad en andamios y vibraciones de herramientas neumáticas según la LPRL y los RDs aplicables.
RAMSagent sugiere enlucido húmedo o extracción de clase H para mantenerse por debajo del límite de polvo de sílice.
Riesgos habituales para Procedimiento seguro — Enfoscado
| Riesgo | Descripción | Referencia legal | Gravedad |
|---|---|---|---|
| Respirable Crystalline Silica | Removing and mixing plaster mortar releases respirable crystalline silica. Dry grinding is prohibited without H-class extraction — wet grinding is the standard. | AFS 2023:10, 3 kap | Alto |
| Alkaline Skin Damage | Cement mortar and hydraulic lime mortar have a pH >12. Skin and eye protection are mandatory. | AFS 2023:10, 8 kap | Alto |
| Falls from Scaffolding | Plastering is performed from scaffolding in class 3–4. Materials must be lifted mechanically, not carried, and the scaffold platform must be clean. | AFS 2013:4; AFS 2023:11 | Alto |
| Vibration from Chipping Machine | Removing existing plaster with a pneumatic chisel causes hand-arm vibration. A(8) over 2.5 m/s² requires action. | AFS 2005:15 | Alto |
Normativa aplicable
- AFS 2023:10 Chemical Workplace Risks
- Chapter 3 (respirable crystalline silica) and Chapter 8 (skin exposure to alkaline mortars).
- AFS 2013:4 Scaffolding
- Plaster scaffolding is designed for materials and mortar — typically class 3–4.
- AFS 2005:15 Vibrations
- Action and limit values for hand-arm vibration during chipping and mixing.
Preguntas frecuentes
- What scaffold class is required for plastering?
- Typically class 4 (250 kg/m²) since materials are stored on the scaffold. For light plastering only, class 3 may suffice — RAMSagent selects based on projected load.
- Can plaster be dry ground?
- Only with H-class extraction directly on the machine plus FFP3 as secondary protection. In practice, wet grinding is standard as it is safer.