Evaluación de riesgos para Estructura — crea con RAMSagent
Una evaluación de riesgos para la construcción de estructuras evalúa los riesgos generales del proyecto durante el montaje de estructuras portantes — prefabricados, columnas, forjados. Incluye caídas desde altura, levantamientos pesados, riesgo de atrapamiento y restricciones climáticas según la LPRL y el RD 1215/1997.
RAMSagent calcula la criticidad del plan de levantamiento y señala las medidas relacionadas con el proyecto.
Riesgos habituales para Evaluación de riesgos — Estructura
| Riesgo | Descripción | Referencia legal | Gravedad |
|---|---|---|---|
| Falls from Height | Falls are the leading cause of fatal accidents in structural construction. Collective protection (safety nets, guardrails, personnel lifts) is prioritized over personal protective equipment. | AFS 2023:11, 15 kap | Crítico |
| Heavy Lifting and Crane Operations | Elements over 10 tons, lifts over people, and night lifts are classified as critical — a separate lifting plan is required for each operation. | AFS 2006:6 | Crítico |
| Weather-Dependent Work | Wind speeds exceeding 10 m/s halt the assembly of large elements. Snow and ice at the assembly site create slip hazards and load temporary bracing. | AFS 2023:11, 15 kap | Alto |
| Crush Risks and Falling Materials | Fitting, wedging, and unhooking are operations with significant crush risks. Falling tools to a lower level require barriers or protective canopies. | AFS 2023:13, 10 kap | Alto |
Normativa aplicable
- AFS 2023:1 Systematic Health and Safety Management
- Framework regulations for systematic health and safety work.
- AFS 2023:11 Work at Height
- Chapter 15 for construction: collective protection and rescue plans.
- AFS 2006:6 Use of Lifting Equipment
- Requirements for lifting plans, crane operators, and signal persons.
Preguntas frecuentes
- When is a separate lifting plan required?
- For critical lifts: over 10 tons, personnel lifts, lifts over people or public traffic, or at unusual angles (HSE guidance).
- What temporary bracing is needed?
- Bracing is designed based on snow, wind, and self-weight until permanent connections are made. Structural calculations should be included in the risk assessment.