Une évaluation des risques pour la construction de structures évalue les risques globaux du projet lors du montage de constructions porteuses — préfabriquées, colonnes, planchers. Elle comprend les chutes de hauteur, les levés lourds, les risques de pincement et les restrictions météorologiques conformément au Code du travail.

RAMSagent calcule la criticité du plan de levage et signale les mesures liées au projet.

Risques typiques pour Évaluation des risques — Gros œuvre

Risques, description et référence légale applicable
Risque Description Référence légale Gravité
Falls from Height Falls are the leading cause of fatal accidents in structural construction. Collective protection (safety nets, guardrails, personnel lifts) is prioritized over personal protective equipment. AFS 2023:11, 15 kap Critique
Heavy Lifting and Crane Operations Elements over 10 tons, lifts over people, and night lifts are classified as critical — a separate lifting plan is required for each operation. AFS 2006:6 Critique
Weather-Dependent Work Wind speeds exceeding 10 m/s halt the assembly of large elements. Snow and ice at the assembly site create slip hazards and load temporary bracing. AFS 2023:11, 15 kap Élevé
Crush Risks and Falling Materials Fitting, wedging, and unhooking are operations with significant crush risks. Falling tools to a lower level require barriers or protective canopies. AFS 2023:13, 10 kap Élevé
AFS 2023:1 Systematic Health and Safety Management
Framework regulations for systematic health and safety work.
AFS 2023:11 Work at Height
Chapter 15 for construction: collective protection and rescue plans.
AFS 2006:6 Use of Lifting Equipment
Requirements for lifting plans, crane operators, and signal persons.

Questions fréquentes

When is a separate lifting plan required?
For critical lifts: over 10 tons, personnel lifts, lifts over people or public traffic, or at unusual angles (HSE guidance).
What temporary bracing is needed?
Bracing is designed based on snow, wind, and self-weight until permanent connections are made. Structural calculations should be included in the risk assessment.