Procjena rizika za Fasada — izradi u RAMSagentu
Procjena rizika za fasadu ocjenjuje projektne rizike prilikom montaže scaffolda, renovacije ili nove izgradnje fasade. Obuhvaća zaštitu od pada, utjecaj vjetra, opasnost od padajućeg materijala na pješake i ergonomiju pri radu na visini.
RAMSagent generira planove za scaffolding i zaštitu od pada na temelju visine fasade, odabira materijala i blizine javnosti.
Tipični rizici za Procjena rizika — Fasada
| Rizik | Opis | Pravna osnova | Ozbiljnost |
|---|---|---|---|
| Falling from Scaffold | Façade scaffolding over 2 m without complete guardrails poses the highest risk of fatal accidents on the project. Scaffold class, contractor certification, and inspection are required. | AFS 2023:11, 15 kap; AFS 2013:4 | Kritičan |
| Falling Materials | Façade work over public traffic requires protective canopies, solid scaffolding, or closed passages. The risk assessment will size these requirements. | AFS 2023:13, 10 kap | Visok |
| Wind Impact | Sheet metal and façade panels are sensitive to wind — storms can throw materials over long distances. Work must stop when wind exceeds 10 m/s. | AFS 2013:4 | Visok |
| Ergonomics at Height | Prolonged work above shoulder height can cause strain injuries in the shoulders and neck. Platform height should be adjustable for each task. | AFS 2012:2 | Srednji |
Primjenjivi propisi
- AFS 2023:1 HSE Guidance
- Systematic approach to health and safety management.
- AFS 2013:4 Scaffolding
- Scaffold classes, training, and inspection.
- AFS 2023:11 Work at Height Regulations
- Chapter 15 for construction sites.
Često postavljana pitanja
- Who inspects the scaffold?
- The scaffold must be inspected after assembly, after weather impacts, and at least once a week by a qualified person (HSE guidance). The inspection checklist is included in the risk assessment.
- What are the requirements for façade work over pedestrian traffic?
- Either closure (permission from local authority/police) or a protective canopy sized for falling materials. The Planning and Building Act imposes additional requirements.