Procjena rizika za Rušenje — izradi u RAMSagentu

Procjena rizika za rušenje je projektna analiza zdravstvenih i sigurnosnih rizika prije početka radova. Procjenjuje vjerojatnost × posljedicu za azbest/PCB/olovo, kvarcnu prašinu, rizike od pada, rizik od urušavanja i promet, te usmjerava izbor razine zaštite prema Zakonu o zaštiti na radu.

RAMSagent gradi procjenu rizika iz inventure materijala i povezuje je s pojedinačnim radnim pripremama po koracima.

Tipični rizici za Procjena rizika — Rušenje

Rizici, opis i primjenjiva pravna osnova
Rizik Opis Pravna osnova Ozbiljnost
Hazardous materials (asbestos, PCB, lead) The dominant project risk in demolition — requires inventory, permit application, and certified remediation before demolition work starts. AFS 2023:10, 16 kap; AFS 2005:6 Kritičan
Silica dust Airborne exposure over 0.1 mg/m³ is the limit value. Project measures: wet cutting, H-class extraction, personal respiratory protection. AFS 2023:10, 3 kap Visok
Collapse risk during partial demolition Renovations where load-bearing elements are removed require structural calculations and shoring systems before demolition. AFS 2023:13, 5 kap Kritičan
Traffic and vehicle movements Container transport, demolition machinery, and site vehicles create collision risks on and around the worksite. AFS 2023:13, 8 kap Visok
AFS 2023:1 Fundamental duties — HSE
The framework for systematic health and safety work: risk assessment, action, follow-up.
AFS 2023:13 Construction and demolition work
Notification and requirements for demolition projects.
AFS 2023:10 Chemical workplace risks
Regulates asbestos, silica dust, and other hazardous substances.

Često postavljana pitanja

What is the difference between risk assessment and method statement?
The risk assessment covers the entire project and evaluates likelihood × consequence. The method statement describes exactly how a specific task is performed safely. RAMSagent links them automatically.
When is notification required for demolition?
When there are more than 30 working days with more than 20 simultaneous workers, or more than 500 person-days in total (HSE guidance, CDM 2015).