Riskbedömning Mark — Rasrisk, schakt och ledningsanvisning Preskoči na sadržaj

Procjena rizika za Zemljani radovi — izradite s RAMSagent

Procjena rizika za zemlju mapira rizike prilikom iskopavanja, miniranja, zabijanja pilota i rada u blizini postojećih instalacija. Temelji se na Zakonu o zaštiti na radu i uključuje zahtjeve za upute o instalacijama prije početka iskopavanja.

RAMSagent procjenjuje geotehniku, blizinu instalacija i faktore urbanog područja kako biste dobili procjenu rizika koja odgovara i fazi projektiranja i proizvodnje.

Tipični rizici za Procjena rizika — Zemljani radovi

Rizici, opis i primjenjivi zakonski okvir
Rizik Opis Zakonski okvir Ozbiljnost
Collapse Risk in Excavations Soil collapse in excavations deeper than 1.25 m without sloping or shoring is one of the leading causes of fatalities in the construction industry — requires geotechnical assessment and support structures. AFS 2023:13, 5 kap Kritična
Blasting Operations Flying debris, shock waves, and vibration damage to nearby buildings — requires blasting permits, site isolation, and warning signals. AFS 2023:13 Kritična
Damage to Existing Utilities Cable damage, gas leaks, or water leaks during excavation without current guidance — utility location checks are essential. AFS 2023:13 Visoka
Collision Risk from Construction Machinery Excavators and dumpers with limited visibility — requires signal monitoring, separate walkways, and high-visibility clothing. AFS 2023:11, 15 kap Visoka
Noise and Vibrations Long-term hearing damage and vibration injuries (HAVS) — requires measurement, hearing protection, and job rotation. AFS 2023:10 Srednja
AFS 2023:13 Risks in Certain Types of Work
Covers collapse risk, excavation, and blasting; tunneling and rock work are addressed.
AFS 2023:1 Fundamental Duties
Systematic health and safety management — the foundation for all groundworks contracts.
AFS 2023:10 Risks in the Workplace
Noise limits, vibrations, and chemical hazards in ground and construction work.

Često postavljana pitanja

When is a geotechnical assessment required?
For excavations deeper than 1.25 m without sloping or support structures. RAMSagent automatically triggers this requirement when excavation depth is specified.
Is utility location integration included?
RAMSagent references utility location checks in the risk assessment but does not automatically retrieve the guidance — the guidance is attached as a file to the project.

Besplatni Word predložak: procjena rizika

Unesite svoju e-mail adresu i prihvatite obradu prema dolje navedenoj politici. Zatim ćete dobiti poveznicu za preuzimanje predloška.