Vai al contenuto

Valutazione dei rischi per Protezione antincendio — crea con RAMSagent

Una valutazione del rischio per la protezione antincendio passiva valuta i rischi di progetto in caso di sigillatura antincendio, vernici antincendio e porte tagliafuoco. Comprende lavori a caldo, esposizione a solventi, lavori in quota e il non compromettere la separazione antincendio esistente secondo il D.Lgs. 81/2008.

RAMSagent collega la descrizione tecnica antincendio alla valutazione del rischio e monitora l'integrità delle sezioni antincendio.

Rischi tipici per Valutazione dei rischi — Protezione antincendio

Rischi, descrizione e riferimenti normativi
Rischio Descrizione Riferimento normativo Gravità
Hot Work Welding, cutting, and soldering require certification, a fire watch for 1 hour afterward, and fire extinguishers. The project must register permits for each hot work site. AFS 2023:6; Heta Arbeten Critico
Fire Protection Paint Intumescent paint contains epoxy or solvents. Ventilation, permits, and medical monitoring are required for isocyanate-based systems. AFS 2023:10, 16 kap Alto
Compromised Fire Separation New penetrations must not compromise fire compartment boundaries. Sealing must meet the same class (EI 30/60/120) as the surrounding construction. BBR 5 Alto
Roof Penetrations Fire stopping of HVAC/electrical penetrations on roofs requires a fall protection plan. Work in combination with hot work increases risk. AFS 2023:11, 15 kap Alto
AFS 2023:1 Systematic Work Environment Management
Systematic approach to managing workplace safety.
AFS 2023:6 Explosive Atmosphere (ATEX)
Hot work and solvent handling.
BBR Building Regulations
Chapter 5 on fire safety — affects fire classification of penetrations.

Domande frequenti

How long is a Hot Work certificate valid?
5 years from issuance, after which it must be renewed through a refresher course. RAMSagent alerts when the certificate is nearing expiration.
What is EI class?
E = integrity (flames), I = insulation (temperature). EI 60 means that the separation holds flames and temperature for 60 minutes. Fire stopping should match the surrounding construction.

Modello Word gratuito: valutazione dei rischi

Inserisci il tuo indirizzo e-mail e accetta il trattamento secondo l'informativa sotto. Riceverai quindi un link per scaricare il modello.