Pracovný postup pre Základy — vytvoriť v RAMSagent

Príprava práce pre zakladanie pokrýva výkop, oporné steny, zhotovenie pilotov a základové dosky. Dokument popisuje sklony svahov, tlak oporných stien, manipuláciu s podzemnou vodou a ťažké zdvihy — so zvláštnym zameraním na riziko zosuvu a požiadavky na dokumentáciu podľa Zákonníka práce.

RAMSagent navrhuje sklon svahu na základe typu pôdy a hĺbky a integruje tlak oporných stien do plánov zdvihu pre výkopové stroje.

Typické riziká pre Pracovný postup — Základy

Riziká, popis a príslušný právny základ
Riziko Popis Právny základ Závažnosť
Collapse in Excavation Excavations deeper than 1.25 m require shoring, sloping (at least 1:1 in stable soil, 1:1.5 in loose soil), or other support systems. No one is allowed in unprotected excavations. AFS 2023:13, 5 kap Kritická
Groundwater and Drowning Pumped excavation bottoms can refill quickly during rainfall. Work near open water requires a rescue plan and life jackets in case of drowning risk. AFS 2023:13, 5 kap Vysoká
Collision with Excavation Machinery Exclusion zones around excavation machinery must be at least 1.5 × reach. A signal person must maintain visibility with the operator during reversing and lifting. AFS 2023:13, 8 kap Vysoká
Culverts and Cables Cable and pipe surveys using cable locators or project documentation are required before machine-driven work. Hand digging is necessary near unprotected lines. AFS 2023:13, 5 kap Vysoká
AFS 2023:13 Construction and Civil Engineering Work
Chapter 5 regulates excavation, sheet piling, and piling — requirements for slope angles, support, and rescue plans.
AFS 2023:11 Work at Height
Applies to work on excavation edges and from pontoons.
AFS 2006:6 Use of Lifting Equipment
Requirements for lifting plans for sheet piling and heavy piling materials.

Často kladené otázky

When is shoring required?
For excavations deeper than 1.25 m that cannot be sloped, or where adjacent buildings/roads are affected. RAMSagent flags if shoring is needed based on projected depth.
What is a rescue plan for excavation?
It describes how a person can be evacuated in case of collapse, groundwater filling, or unconsciousness. According to HSE guidance, it must be available on site.