Una pianificazione del lavoro per la costruzione della struttura descrive come montare in sicurezza le strutture portanti — elementi prefabbricati, colonne, solai e travi. Il documento deve descrivere il piano di sollevamento, le funi di sollevamento, il supporto temporaneo e la protezione contro le cadute prima che gli elementi siano caricati, secondo il D.Lgs. 81/2008 (cadute dall'alto).

RAMSagent integra i piani di sollevamento con la valutazione dei rischi per il montaggio della struttura e propone protezioni collettive per ogni fase.

Rischi tipici per Procedura operativa — Struttura portante

Rischi, descrizione e riferimenti normativi
Rischio Descrizione Riferimento normativo Gravità
Falls from Height During Assembly Floor edges, lift shafts, and roof edges are critical fall edges during structural assembly. Collective protection (guardrails, nets, personnel lifts) should be prioritized over personal fall protection equipment. AFS 2023:11, 15 kap Critico
Heavy Lifting of Prefabricated Elements Lifts over 10 tons require a lifting plan, certified crane operator, and signal person. Wind speeds exceeding 10 m/s suspend lifting unless manufacturer's data allows otherwise. AFS 2006:6 Alto
Crush Risk During Fitting No hands or body parts should be between elements and floor slabs during lowering. Tag lines control the element from a distance. AFS 2023:13, 8 kap Alto
Temporary Bracing Columns and wall elements must be braced until permanent connections are made. The sizing of braces should be shown in the method statement. AFS 2023:11, 15 kap Alto
AFS 2023:11 Work at Height
Chapter 15 regulates construction work and requires collective protection for work above 2 meters.
AFS 2023:13 Design and Execution of Construction Work
Covers prior notification and specific risks during structural assembly.
AFS 2006:6 Use of Lifting Equipment and Devices
Requirements for lifting plans, inspections, signaling, and crane operator certification.

Domande frequenti

What is the difference between structural construction and foundation work?
Foundation work includes piling, slabs, and basement walls. Structural construction refers to the load-bearing structure above ground — columns, floor slabs, roof trusses. RAMSagent has separate method statements for both.
When is a lifting plan required?
For critical lifts (>10 tons, personnel lifts, lifts over people or traffic), HSE guidance requires a written lifting plan to be included in the method statement.