Valutazione dei rischi per Struttura portante — crea con RAMSagent

Una valutazione dei rischi per la costruzione di strutture valuta i rischi complessivi del progetto durante il montaggio di strutture portanti — prefabbricati, colonne, solai. Essa comprende cadute dall'altezza, sollevamenti pesanti, rischio di schiacciamento e restrizioni meteorologiche secondo il D.Lgs. 81/2008.

RAMSagent calcola la criticità del piano di sollevamento e segnala le misure correlate al progetto.

Rischi tipici per Valutazione dei rischi — Struttura portante

Rischi, descrizione e riferimenti normativi
Rischio Descrizione Riferimento normativo Gravità
Falls from Height Falls are the leading cause of fatal accidents in structural construction. Collective protection (safety nets, guardrails, personnel lifts) is prioritized over personal protective equipment. AFS 2023:11, 15 kap Critico
Heavy Lifting and Crane Operations Elements over 10 tons, lifts over people, and night lifts are classified as critical — a separate lifting plan is required for each operation. AFS 2006:6 Critico
Weather-Dependent Work Wind speeds exceeding 10 m/s halt the assembly of large elements. Snow and ice at the assembly site create slip hazards and load temporary bracing. AFS 2023:11, 15 kap Alto
Crush Risks and Falling Materials Fitting, wedging, and unhooking are operations with significant crush risks. Falling tools to a lower level require barriers or protective canopies. AFS 2023:13, 10 kap Alto
AFS 2023:1 Systematic Health and Safety Management
Framework regulations for systematic health and safety work.
AFS 2023:11 Work at Height
Chapter 15 for construction: collective protection and rescue plans.
AFS 2006:6 Use of Lifting Equipment
Requirements for lifting plans, crane operators, and signal persons.

Domande frequenti

When is a separate lifting plan required?
For critical lifts: over 10 tons, personnel lifts, lifts over people or public traffic, or at unusual angles (HSE guidance).
What temporary bracing is needed?
Bracing is designed based on snow, wind, and self-weight until permanent connections are made. Structural calculations should be included in the risk assessment.

Modello Word gratuito: valutazione dei rischi