Hodnotenie rizík pri demolácii je projektové mapovanie zdravotných a bezpečnostných rizík pred začiatkom prác. Posudzuje pravdepodobnosť × následky pre azbest/PCB/olovo, prach z kremíka, riziko pádu, riziko zosuvu a dopravu, a riadi výber úrovne ochrany podľa Zákonníka práce a vyhlášky o bezpečnosti a ochrane zdravia pri práci.
RAMSagent vytvára hodnotenie rizík z inventarizácie materiálov a prepája ho s jednotlivými pracovnými prípravami podľa momentov.
Typické riziká pre Posúdenie rizík — Búranie
| Riziko | Popis | Právny základ | Závažnosť |
|---|---|---|---|
| Hazardous materials (asbestos, PCB, lead) | The dominant project risk in demolition — requires inventory, permit application, and certified remediation before demolition work starts. | AFS 2023:10, 16 kap; AFS 2005:6 | Kritická |
| Silica dust | Airborne exposure over 0.1 mg/m³ is the limit value. Project measures: wet cutting, H-class extraction, personal respiratory protection. | AFS 2023:10, 3 kap | Vysoká |
| Collapse risk during partial demolition | Renovations where load-bearing elements are removed require structural calculations and shoring systems before demolition. | AFS 2023:13, 5 kap | Kritická |
| Traffic and vehicle movements | Container transport, demolition machinery, and site vehicles create collision risks on and around the worksite. | AFS 2023:13, 8 kap | Vysoká |
Príslušné predpisy
- AFS 2023:1 Fundamental duties — HSE
- The framework for systematic health and safety work: risk assessment, action, follow-up.
- AFS 2023:13 Construction and demolition work
- Notification and requirements for demolition projects.
- AFS 2023:10 Chemical workplace risks
- Regulates asbestos, silica dust, and other hazardous substances.
Často kladené otázky
- What is the difference between risk assessment and method statement?
- The risk assessment covers the entire project and evaluates likelihood × consequence. The method statement describes exactly how a specific task is performed safely. RAMSagent links them automatically.
- When is notification required for demolition?
- When there are more than 30 working days with more than 20 simultaneous workers, or more than 500 person-days in total (HSE guidance, CDM 2015).
Súvisiace návody
Beplatná šablóna Word: posúdenie rizík
Zadajte svoj e-mail a súhlaste so spracovaním podľa zásad nižšie. Potom dostanete odkaz na stiahnutie šablóny.